Sunday, 3 April 2016

Southeast Asia Data Center Construction Market Research Forecasts,2020

Report:Data Center Construction Market in Southeast Asia 2016-2020 is a new market research publication announced by Reportstack.
Report Outline:
The report covers the present scenario and the growth prospects of the data center construction market in Southeast Asia for 2015-2020. To calculate the market size, the report considers the revenue generated from the building of new data centers (including modular data center facilities) and the renovation of data centers.
The market is divided into the following segments based on electrical construction: 
• UPS
• Energy storage equipment
• Generators
• Transfer switches and switchgear
The construction of a data center encompasses design, architecture, installation of electrical and mechanical systems, and general construction works. The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in Southeast Asia to construct data centers to gain a competitive edge.
For detailed report with TOC, please click ​Data Center Construction Market in Southeast Asia 2016-2020.
Market Growth:
The data center construction market in Southeast Asia is expected to grow at a CAGR of 14.8% during the period 2016-2020.
Key Vendors:
  •  CSF Group
  • M+W Group
  • Nakano Construction
  • Sara-Timur
  • Wah Loon Engineering 
  • Other Prominent Vendors:
  •  Alphamatic Systems
  • AWP Architects
  • CPG Consultants
  • DSCO Group
  • Kienta Engineering Construction
  • Kinetics Corporate
  • Nova
  • PWS (Malaysia)
  • Sato Kogyo

  • Companies Mentioned
    CSF Group, M+W Group, Nakano Construction, Sara-Timur, Wah Loon Engineering, Alphamatic Systems, AWP Architects, CPG Consultants, DSCO Group, Kienta Engineering Construction, Kinetics Corporate, Nova, PWS (Malaysia), Sato Kogyo.
    Contact:
    Debora White
    Manager - Marketing
    debora@reportstack.com
    Ph: +1-888-789-6604
    ​Reportstack Market Research
    ###

    No comments:

    Post a Comment